More Than Just Asphalt

logo
phone

Get In Touch With Us
(+267) 3902416

banner

Road Surfacing

Road Surfacing

With an impressive track record of over 32 years in the construction industry

  • We are a company of choice with respect to bituminous road surfacing
  • Road surfacing is the mainstay of the company and amongst the activities we do, asphalt overlay, chip and spray, cape seal, Otta seal, fog spray and slurry seals.
  • The Gaborone – Boatle dual carriageway at a cost of P68 million with 18 kilometre dual carriage and 2 overpasses is our latest major accomplishment after surfacing of the 30km Gaborone Metsimotlhabe dual carriageway costing P30 million
  • The work experience is more detailed on the works carried out thus far.

Gaborone/Boatle dual carriageway

The total cost for the project is P1.2 Billion and consist of two bridges, 2 overpasses, 18 km dual carriageway with associated drainage works, street lighting, interlocking paving for median and walkways, 50mm continuously coarse graded asphalt. The Asphalt Works were done at P68million.

Download Company Profile

Download PDF
gallery
Gaborone/Boatle Dual Carriageway
gallery
Gaborone/Boatle Dual Carriageway
gallery
Gaborone/Boatle Dual Carriageway
gallery
Gaborone/Boatle Dual Carriageway
gallery
Gaborone/Boatle Dual Carriageway
gallery
Gaborone/Boatle Dual Carriageway
gallery
Gaborone/Boatle Dual Carriageway
gallery
Gaborone/Boatle Dual Carriageway